Maeslant Barrier

Not rated yet
log in to rate!
Quist Wintermans Architecten
 
location Hoek van Holland
function barrier, landmark, water management
contributed by Naomi

The Netherlands is located in a low-lying delta where large rivers such as the Rhine and IJssel run into the sea. The history of the country has been determined by the struggle against water. The Flood Disaster in 1953 was a rude awakening. Measures to prevent a repetition of the disaster were put forward in the form of the Delta Plan. This Storm Surge Barrier in the New Waterway is part of that plan. If a water level of 3.00 m above NAP is anticipated for Rotterdam the barrier has to be closed. In the event of a storm tide, the docks are filled with water so that the hollow gates start to float and can be turned into the New Waterway. Once the gates meet, the cavities are filled with water and the gates sink to the bottom, thus sealing off the 360 m-wide opening. After the high water has passed the gates are pumped out and the structure begins to float again. Once it is certain that the next high water will not be another abnormally high one, the two gates are returned to their docks.

 

RSS
(1)
Comments
Naomi says:
Check out the satellites. The visiting address that is published here is of the visitor centre. You can walk from there to the barrier.
Amsterdam, Netherlands 16-Sep-07
ADD COMMENT
We prefer you log in when posting a comment.
No MIMOA account? Register here!
Name:
You can ad links, video's and even use some HTML!
SUBMIT
show all projects
full size map
Facts
Maeslant Barrier
Address
Nieuw Oranjekanaal 139
Netherlands
http://www.keringhuis.nl/
Project is public!
Opening hours Monday-Friday from 10.00 to 16.00 hours. Saturday, Sunday and public holidays 11.00 to 17.00 hours. Closed on 25 December, 31 december and 1 January. Admission is free.
How to get there? Car: From Rotterdam A20 to Hoek van Holland. After Maassluis take Hoek van Holland exit. Follow N220 take left exit to Maeslantkering. From The Hague: Follow signs for Hoek van Holland. At Hoek van Holland - Maassluis (N220) take ‘Maeslantkering’ turn. Public transport: Train from Rotterdam get out at Hoek van Holland Haven. From the station take taxi or hire a cycle. By water: Given prior notification it’s also possible to moor by boat. Telephone for further information see the website.
Completion 5- 1997
Cost € 360000000,-
ArchitectQuist Wintermans Architecten
contractorBouwkombinatie Maeslant Kering
services engineerBouwkombinatie Maeslant Kering
structural engineerBouwkombinatie Maeslant Kering
technical engineerBouwkombinatie Maeslant Kering
Client Rijkswaterstaat
 
Project ID 942
Latitude/Longitude 51°57'24N 04°10'01E
Contributed by Naomi
Found incorrect or incomplete information?
Let us know! Have better images?
Email them to us
ADD NEW PROJECT